AD: Bombardier, Inc. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Nov 08, 2018

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2018-22-12

PRODUCT: Certain Bombardier, Inc., Model CL-600-2C10 (Regional Jet Series 700, 701, & 702) airplanes; Model CL-600-2D15 (Regional Jet Series 705) airplanes; Model CL-600-2D24 (Regional Jet Series 900) airplanes; and Model CL-600-2E25 (Regional Jet Series 1000) airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by reports of damage to the protective coating and corrosion on the piston/axle of the main landing gear (MLG), caused by friction between the inboard axle sleeve and the axle thrust face.

This AD requires revising the maintenance or inspection program, as applicable, to incorporate a detailed inspection of the MLG piston/axle for damage to the protective coating and for corrosion.

DATES: This AD is effective December 12, 2018.

COST: The FAA estimates  that this AD affects 530 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD: Revising the maintenance or inspection program takes an average of 90 work-hours per operator, although this number may vary from operator to operator.

In the past, the FAA has estimated that this action takes 1 work-hour per airplane. Since operators incorporate maintenance or inspection program changes for their affected fleet(s), the FAA has determined that a per-operator estimate is more accurate than a per-airplane estimate.

Therefore, the estimated total cost per operator to be $7,650 (90 work-hours x $85 per work-hour).

FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC