MER-A Mars Exploration Rover Targeted For Launch June 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, May 28, 2003

MER-A Mars Exploration Rover Targeted For Launch June 8

The first of two Mars Exploration Rovers, MER-A, is targeted for launch no earlier than Sunday, June 8 at 2:05:55 p.m. EDT. Liftoff will occur aboard a Boeing Delta II launch vehicle from Pad A at Space Launch Complex 17 on Cape Canaveral Air Force Station. A second launch opportunity exists at 2:44:07 p.m. EDT, if necessary.

Should launch be delayed by 24 hours, the two launch times available are 2:02:23 p.m. and 2:40:30 p.m. EDT. The planetary launch period window extends through June 19. The second of the two rovers, MER-B, is scheduled to launch June 25.

MER-A will reach Mars on Jan. 4, 2004, and MER-B on Jan. 25. The two MER missions seek to determine the history of climate and water at two sites on Mars where conditions may once have been favorable to life. Both rovers are identical.

Each rover carries five scientific instruments including a panoramic camera and microscope, plus a rock abrasion tool that will grind away the outer surfaces of rocks to expose their interiors for examination. The rovers each weigh approximately 400 pounds. They will navigate themselves around obstacles as they drive across the Martian surface, traveling up to about 130 feet each Martian day. Each rover's prime mission is planned to last three months on Mars.

FMI: http://mars.jpl.nasa.gov/mer

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC