NASA Awards Contracts For Orion Heat Shield Material | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, May 08, 2007

NASA Awards Contracts For Orion Heat Shield Material

Agency Seeks Reliable Backup Options

NASA announced Friday it selected The Boeing Company and Textron Systems to develop alternate heat shield materials for the Orion crew exploration spacecraft.

The two contracts for Alternate Block 2 Thermal Protection System (TPS) Materials and Heat Shield Systems Advanced Development will support development and testing of three alternative heat shield materials. The companies are challenged with developing technologies can be used as backups for the primary material, according to NASA.

Orion is scheduled to carry astronauts to the International Space Station by 2015, with a goal of landing astronauts on the moon by 2020. The Orion TPS Advanced Development Project, led by Ames Research Center, Moffett Field, CA was established to develop a heat shield to protect Orion during its return from low-Earth orbit or the moon.

In September 2006, Boeing was awarded a contract to develop the primary heat shield material, Phenolic Impregnated Carbon Ablator (PICA), manufactured by its subcontractor, Fiber Materials, Inc. based in Biddeford, ME. It will only develop the alternate material if the primary material does not perform to Orion Project specifications. NASA will assess and evaluate all of the Alternate Block 2 TPS materials through initial testing and select the most promising of the materials for further development, if needed.

The value of the Boeing contract is approximately $10 million and calls for Boeing to perform early investigation of a proprietary material, the Boeing Phenolic Ablator (BPA). Textron's contract has a value of about $24 million calls for early investigation of two proprietary material options, Avcoat, which was also used on Apollo, and Dual Layer.

Each contract has a 16-month performance period from May 4, 2007 until August 31, 2008, according to NASA.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC