The Dreamliner Roars: Boeing Completes First 787 Dreamliner Engine Runs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, May 22, 2009

The Dreamliner Roars: Boeing Completes First 787 Dreamliner Engine Runs

Dreamliner Converts Fuel To Noise

Is Boeing getting the 787 back on track? Judging by recent events, it sure looks like progress is being made... and on something that actually resembles a schedule... albeit a much modified one.

Regardless; it shows steady progress toward the first flight of the 787 Dreamliner, as Boeing completed the first engine runs on the all-new airplane, Thursday morning. The occasion marks the first all-electric start of a commercial jetliner engine on a commercial jetliner; the engines had been started electronically in test facilities earlier.

Engine runs began at 9:30 a.m. (PDT) today and ended 40 minutes later. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. Today's engine run test began with the Auxiliary Power System providing power to start the two Rolls-Royce Trent 1000 engines.

Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

"We were very pleased with the performance on the engines during this test," said Scott Fancher, vice president and general manager of the 787 program. "We will now get ready for our intermediate and final gauntlet tests."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC