OUCH! Boeing Hemorrhages $4.4B On B787 Order Cancellation | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, May 09, 2009

OUCH! Boeing Hemorrhages $4.4B On B787 Order Cancellation

2009 Is Creating Major Pain For Airliner Builders

Like the news about Airbus A380 delivery cutbacks, there continues to be some serious pain occurring on the Boeing side of the airline building business. Media reports confirm that Boeing has lost a 25 airplane order from an unnamed customer for a whopping 25 B787 Dreamliners... a order that should have totaled about $4.4 Billion. In any language, that is a serious boo-boo.

It is reportedly the biggest cancellation yet on Boeing's high-profile Dreamliner, now scheduled to make a first flight in under 60 days and brings Boeing to a net loss of one order for the 2009 totals tallied up so far this year. With 59 cancellations and 58 orders for the year, the additional loss means that there has been a total contraction of 57 airframes for the high-flying modern jetliner effort.  

Still, the 787 order book still leads Boeing's efforts with a total roster of 861 orders remaining on a program that is now two years behind schedule.

While Airbus is claiming somewhat better results for '09 with 30 sales and 19 cancellations (14 A320s and 5 A350s), no one expects those numbers to remain a constant. Depending on the recent escalations in the price of oil and the continuing economic issues worldwide, a number of other aircraft sales are reportedly on the bubble.

Boeing hopes to certify the mostly composite 787 next year and build a total of approximately 480-485 airplanes during 2009.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC