Successful First Flight For UAE's Initial PC-21 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Nov 28, 2010

Successful First Flight For UAE's Initial PC-21

Pilatus Delivers Military Trainer One Year After Signing The Contract

The initial flight of the first Pilatus PC-21 for the United Arab Emirates (UAE) Air Force & Air Defence took place Monday, one year to the day after the contract was signed.


Pilatus PC-21

Prior to first flight, the aircraft was rolled out and presented to the UAE Air Force & Air Defence by Oscar Schwenk, Chairman & CEO of Pilatus Aircraft Limited, in a ceremony attended by members of the Pilatus executive management and project teams from both parties.

After the roll-out, the aircraft's first flight was a ferry flight to the Buochs airfield. Pilatus' chief test pilot departed at 1034 local time on a flight which served as the final check for quality control and conformity. After engine checks on the runway, aircraft was taken to 10,000 feet, where an engine shut down and restart sequence is performed to prove the functionality of the engine related systems. Next, various mechanical systems are checked, including flight controls systems, airframe stall characteristics, engine performance and inverted flight. Finally the landing gear functionality was tested, the data was examined, and the aircraft prepped for the remaining production flight test.


Pilatus PC-21 Cockpit

A post flight debriefing was undertaken with the UAE Air Force & Air Defence, represented by Brigadier General Sami Saeed Al Nuaimi, and this formally closes this element of the project.

Delivery of the 25 PC-21 aircraft and the other key components of the Pilatus training system are scheduled to commence in the first quarter
2011.

FMI: www.pilatus.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC