Boeing Confirms Work Stoppage At Italian Plant | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Aug 16, 2009

Boeing Confirms Work Stoppage At Italian Plant

Facility Builds Two Mid-Fuselage Sections Of The Dreamliner

A production flaw in Dreamliner fuselage sections detected at the Alenia Aeronautica plant in Naples has caused production work to be stopped there, Boeing has confirmed.  Structural weakness in the composite fuselage sections could cause a wrinkling of the material that could lead to "significant degradation" if left unrepaired.

The Wall Street Journal reports that the work stoppage was called for in a June 23 letter to the plant, according to the paper. In an e-mail, Boeing spokeswoman Lori Gunter said the problem was not as serious as had been implied. "After a thorough review we found only two locations on each airplane that needed to be strengthened with a fairly simple patch," she said. "(A) modification needed to accommodate these findings is already designed and being installed" on the affected fuselage parts."

While it is possible that two of the six test platform aircraft may need the repair before their first flights, Gunter did not say that was certain.

The problems apparently cropped up when Alenia began using a new tooling machine on the 5th 787 to be manufactured there. Manufacturing is still at a standstill while Boeing engineers work to reduce the potential for wrinkling in the composite skin of the aircraft.

When asked if Boeing should have disclosed the problem sooner, Ms. Gunter said "The stoppage of work has no affect on schedule or cost. This is fairly normal for a new development program. These issues come up and we deal with them and move on."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC