Raytheon Wins $234 Million U.S .Navy Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Jun 23, 2019

Raytheon Wins $234 Million U.S .Navy Contract

Will Provide 23 Joint Precision Approach And Landing Systems

Raytheon has won a four-year $234 million initial low-rate production contract from the U.S. Navy to outfit all of its nuclear-powered aircraft carriers and amphibious assault ships with 23 Joint Precision Approach and Landing Systems. JPALS is a GPS-based precision landing system that guides aircraft to precision landings in all weather and surface conditions.

"The U.S. Navy understands how JPALS contributes to their mission success and safety of its people," said Matt Gilligan, vice president of Raytheon's Intelligence, Information and Services business. "Other military services could also benefit from the system's ability to safely land both fixed and rotary-wing aircraft in almost any low-visibility environment."

Since 2018, U.S. Marine Corps F-35B Lightning II fighter pilots have used JPALS to guide them onto the USS Wasp amphibious assault ship during deployed operations in what U.S. Navy Captain B. Joseph Hornbuckle III, program manager, Naval Air Traffic Management Systems Program Office called 'the most difficult conditions on Earth."

Earlier this year, F-35B pilots participated in two demonstrations of a new expeditionary version of the JPALS system that brings the same precision capability from sea to shore. The proof-of-concept events showed how the GPS-based system could be reconfigured into a mobile version to support landings in a traditional airport setting.

Expeditionary JPALS fits in five transit cases and could be repackaged for a variety of small transit vehicles transportable by C-130. Once on the ground, the system can be fully operational in under 90 minutes.

(Image provided with Raytheon news release)

FMI: www.raytheon.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC