Gulfstream G250 Program Forges Ahead As Icing Tests Commence | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 10, 2011

Gulfstream G250 Program Forges Ahead As Icing Tests Commence

Airplane Being Evaluated For FIKI

The Gulfstream G250 flight-test aircraft have completed several ice-test certification points in anticipation of the aircraft's certification later this year.

Serial Number (S/N) 2001, the first aircraft to join the flight-test program on Dec. 11, 2009, has flown with simulated ice shapes applied to the non-heated areas of the aircraft, including the nose, tail, winglets and engine pylon. These tests were used to evaluate the aircraft's handling, stability and control characteristics in icing conditions.

S/N 2002, which joined the flight-test program on March 24, 2010, has completed anti-ice system dry-air testing, clearing the way for certification flight testing into known icing conditions. The aircraft is poised to visit the United States in search of natural icing. The G250 uses an anti-ice system similar to Gulfstream's large-cabin aircraft, in that heated bleed air from the engines is routed to the leading edges to prevent ice formation.

The three aircraft in the flight-test campaign have completed more than 220 test flights, spending more than 700 hours in the air. The longest flight was more than seven hours. The maximum speed achieved was Mach 0.85, and the maximum altitude was 45,000 feet. On Dec. 9, 2010, all three flight-test aircraft flew simultaneously for the first time.

Since its first flight on Dec. 11, 2009, S/N 2001 has confirmed a wide range of data, including minimum control air speeds, initial cruise performance and flight-control system/ flight-control law performance. Additionally, S/N 2002 has undergone certification for smoke evacuation, auxiliary power unit (APU) electrical loads, fuel system functionality, the cabin pressure control system (CPCS), overall aircraft loads and stall characteristics with different centers of gravity.

S/N 2003, the last aircraft to join the flight-test program, has undergone avionics certification testing and numerous systems checks. Additionally, S/N 2003 made its first trans-Atlantic crossing in support of the National Business Aviation Association (NBAA) Conference and Exhibition in Atlanta last year. It also performed far-field noise and high-field elevation testing.

While the test aircraft continue to push through the flight-test campaign, several other activities are under way on the ground. Testing is ongoing in the Integration Test Facility (ITF) at Gulfstream's headquarters in Savannah, where engineers are evaluating the PlaneView 250 avionics system by examining software and hardware integration, systems development and human factors. They're also developing and validating the procedures that will be used in the Airplane Flight Manual (AFM). Optional avionics features, such as the head-up display (HUD) and Gulfstream Enhanced Vision System (EVS) II are also being tested in the ITF.


ITF Cockpit Mockup

Additionally, all structural limit and ultimate load tests have been successfully completed. The fatigue test article has been moved to the structural test hangar, where it will be used to test the structural integrity of the airframe over more than 40,000 cycles.

At the same time, manufacturing of the first non-test aircraft, S/N 2004, continues at Israel Aerospace Industries near Tel Aviv. The forward, center and aft fuselage sections have been joined, and systems installation is under way. Production of the interior furnishings is under way at Gulfstream's mid-cabin completions center in Dallas, where the G250 will be outfitted and painted.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC