Urgent CASA AD: Eurocopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Feb 22, 2006

Urgent CASA AD: Eurocopter

Applicability: Eurocopter AS 365 N2 and N3 model helicopters.

Requirement:

1. Carry out a check for end play in the tail rotor hub (TRH) control plate in accordance with paragraph 2.B of Eurocopter Alert Service Bulletin (ASB) 05.00.52 or later DGAC approved revisions. If there is no end play in the TRH control plate no further action is required at this time.

2. If there is end play in the TRH control plate, remove and replace the pitch control rod bearing in accordance with paragraph 2.B.2 of Eurocopter ASB 05.00.52 or later DGAC approved revisions.

Note: EASA Emergency AD 2006-0051-E refers.

Compliance:

1. Within 50 flying hours after the effective date of this AD, thereafter at intervals not to exceed 110 flying hours.
2. Before further flight following the check carried out in Requirement 1 of this AD. This Airworthiness Directive becomes effective on 27 February 2006.

Background: This AD is in response to an event where tail rotor pitch control loss occurred during the landing phase of the helicopter. Failure of the pitch control rod bearing can lead to loss of control of the tail rotor and subsequent loss of control of the helicopter.

FMI: www.casa.gov.au

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC