Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Jun 18, 2016

Ultimate Load Testing On Gulfstream G500 Validates Structural Integrity

Stressed To 150 Percent Load Limit, Fulfilling Certification Requirement

Gulfstream has completed ultimate load testing for its new Gulfstream G500. Ultimate load represents 150 percent of limit load and is equivalent to a 1.5 safety factor specified by the FAA and EASA. Limit load is the maximum level that an aircraft should experience once during its service life. Completion of the full-scale aircraft ultimate test fulfills the certification requirements for both the FAA and EASA.

Carried out over five months, the testing focused on the aircraft’s fuselage, wing, vertical and horizontal stabilizers and control surfaces. It involved eight primary test conditions, including wing up and down bending, horizontal up and down bending and wing torsion.

More than 6,000 channels of instrumentation, including load cells, strain gages, displacement transducers and instrumented links/pins, were used to monitor the test article’s structural response. Cameras inside the wing, empennage and fuselage allowed engineers and technicians real-time insight into the structure’s behavior.

“This is a significant accomplishment in development of the G500,” said Mark Burns, president, Gulfstream. “The successful completion of these tests confirms the airframe’s solid construction, fulfills certification requirements and clears the way for us to proceed with additional testing.”

Gulfstream will now conduct an additional company test, applying increasingly higher loads to determine the structural test article’s destruction point. Destructive testing of aircraft components is important to demonstrate and refine Gulfstream’s engineering models, designs and analysis methods.

Later this year, Gulfstream will begin a multi-year fatigue program for the G500 that will simulate three lifetimes of airframe operation.

(Source: Gulfstream new release. Image from file)

FMI: www.gulfstream.com

 


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC