Aero-TV At NBAA2011 Revisited: Bombardier 2011 -- Learjet 85 Progress Report | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Oct 18, 2011

Aero-TV At NBAA2011 Revisited: Bombardier 2011 -- Learjet 85 Progress Report

Newest Lear On Track For 2013 EIS

Production of the new Learjet 85 aircraft has officially begun as the program successfully exited the Aircraft Level Critical Design Review. Development and production teams in Wichita, Kansas; Montréal, Québec; Belfast, Northern Ireland; and Querétaro, Mexico, are actively engaged in the manufacturing validation phase.

Ralph Acs, Vice President and General Manager, Learjet, Bombardier Business Aircraft said the airplane is making solid progress. He said the manufacturing sites are ready, production has begun, and they have been successfully building parts and we are ensuring that all quality standards are met for the Learjet 85 aircraft’s entry into service in 2013.

The Querétaro site is operational with production tooling in place. To date, several test fuselages and key elements of the composite structure have been produced at the facility to validate the manufacturing and assembly processes. In addition, a full-length composite fuselage has been assembled, and production of the first flight test vehicle is underway.

The Learjet 85 aircraft program supply base has started the fabrication of parts, and is on track with approximately 40 per cent of dedicated supplier test rigs that are operational, running their respective systems prior to shipment to the final line.

As part of Bombardier’s technology readiness program, over 12,000 test pieces have been produced to date. The first FAA structural certification test project was successfully completed this summer.

FMI: www.bombardier.com, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

 


Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC