Report: Boeing Production Cutbacks Will Mean More Job Cuts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Apr 10, 2009

Report: Boeing Production Cutbacks Will Mean More Job Cuts

Suppliers Could Start Feeling Affects This Year

Boeing's announcement Thursday it would slash 2010 production rates on its largest -- and most profitable -- airliners didn't come as much of a surprise for industry watchers.. and its likely ramifications won't surprise many, either.

The Seattle Times reports those cutbacks will lead to further job losses at Boeing's widebody production facility in Everett, WA by the middle of next year. Workers at facilities supplying parts for those aircraft could start laying off employees by the end of this year, as the planemaker trims its needed parts numbers to produce fewer aircraft.

In an interview with the Times, Boeing spokesman Jim Proulx said the planemaker expects the slowdown to bring "employment reductions beyond those already announced," though he didn't talk numbers.

Already in 2009, Boeing has announced plans to cut 4,500 workers from its commercial airplane division, and as many as 10,000 jobs company-wide. Those earlier cuts weren't tied to reductions in production output.

Boeing employees approximately 28,000 workers at Everett, according to the Times. Hopes that some job losses could be curbed by increased work on the upcoming 787 Dreamliner appear unlikely, as well.

An executive at one Boeing supplier for the 787 program said Boeing no longer plans an aggressive ramp-up once the composite-bodied airliner is certified, due to expected delivery deferrals and outright cancellations due to the sluggish economy.

"Rather than ramping up, the (787 suppliers) are really slowing things down," the executive said.

Boeing has received 32 order cancellations so far in 2009, all for the oft-delayed Dreamliner.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC