Congress Hears NASA Heavy-Lift Proposal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jan 13, 2011

Congress Hears NASA Heavy-Lift Proposal

Latest Plan Relies Heavily On Shuttle Technology

NASA has sent its latest interim report on heavy-lift capability to the U.S. Congress, telling the body that it would be impossible to build within the current time and budget constraints imposed on the agency. It said the same was true of any crew vehicle the rocket would carry.


NASA Image From Cooke Report

The study was mandated by the NASA Authorization Act of 2010, which became law last October.

NASA Associate Administrator for explorations systems Doug Cooke outlined the agency's basic heavy-lift concept to the NASA Advisory Council Tuesday. The launch vehicle uses shuttle engines and fuel tanks, along with larger versions of the SRBs which currently boost the shuttle into orbit. Space News reports that Cooke told the panel that the design would use "existing Shuttle main engine and booster component assets in the near term," but that the main engine technology could be upgraded when the inventory of existing engines and fuel tanks was exhausted. He said that would allow contracts already in place to be fulfilled without costly cancellations


NASA's Doug Cooke Image Credit Bill Ingalls

But, he said "to be clear, neither Reference Vehicle Design currently fits the projected budget profiles or schedule goals outlined in the Authorization Act."

The Authorization Act gives the agency another five years to field heavy lift and crew vehicles with a three-year budget of $10 billion.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC