AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 11, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-17-05

PRODUCT: Certain Airbus SAS Model A330-200 Freighter, -200, and -300 series airplanes; and certain Airbus SAS Model A340- 200, -300, -500, and -600 series airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by a determination that certain wing slat tracks that were inadvertently indicated as eligible for installation on all Model A330 and A340 series airplanes are unable to sustain the ultimate loads relative to the weight variant of certain airplane configurations.

This AD requires identifying affected parts, inspecting for and repairing cracks, and replacing affected parts with serviceable parts, as specified in a European Aviation Safety Agency (EASA) AD, which is incorporated by reference.

DATES: This AD is effective October 15, 2019.

COST: The FAA estimates that this AD affects 104 airplanes of U.S. registry.  Operators may incur the following costs in order to comply with this AD:

Required Actions:

  • Labor: 7 work-hours × $85 per hour = $595 per airplane.

On-condition costs:

  • Labor: 8 work-hours × $85 per hour = $680 per airplane.

According to the manufacturer, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage for affected individuals. As a result, the FAA has included all known costs in the cost estimate.

FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC