Embraer Executive Jets Launches Legacy 450 Fabrication | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Aug 15, 2012

Embraer Executive Jets Launches Legacy 450 Fabrication

First Parts Milled For The New Bizjet

Embraer Executive Jets passed a major milestone in the mid-light Legacy 450 program last week when the first part was milled for the business jet, ushering in the beginning of fabrication. "Even as we have been making progress on the Legacy 500, we have been anticipating this event for the Legacy 450,” said Ernest Edwards, President, Embraer Executive Jets. “The first metal cut for the Legacy 450 is a landmark event for the program and is the latest step in bringing this, the second of our revolutionary jets to reality.”

A component of the forward fuselage, the part was milled from a block of aluminum alloy by a five-axis, high-performance machining center. Fully automated, the milling process drew data directly from a digital mockup of the 2,300-nm-range Legacy 450. Once completed, the part was approved by a quality control process that employed the use of laser devices for design validation with the digital mockup.
 
The Legacy 450 is designed with the latest engineering software, CATIA V5, with production planning for the business aircraft simulated by digital virtual manufacturing software. The first metal cut comes after the completion of the Joint Definition Phase for the aircraft in May. The Detailed Design and Certification Phase is ongoing and the Critical Design Reviews are scheduled to be completed at the end of August.
 
For both the Legacy 450 and mid-size Legacy 500, Embraer has completed more than 8,000 systems test hours with 2,500 hours logged on the Iron Bird since November 2010. The two aircraft bring fly-by-wire technology to the mid-light and mid-size segments for the first time.

(Images provided by Embraer)

FMI: www.embraer.com


Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC