You Can't Keep A Galaxy Down | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Mar 03, 2004

You Can't Keep A Galaxy Down

Battle-damaged C-5 Repaired, Ready For Duty  

The C-5 Galaxy that was hit by a missile shortly after takeoff in Iraq on Jan. 8 receives permanent repairs here. The aircraft was returned to Air Mobility Command on Feb. 23. Workers in the C-5 Galaxy production branch feel closer to the warfighter now that they have completed battle-damage repair on the C-5 hit by a missile shortly after takeoff in Iraq on Jan. 8. The aircraft (file photo, right) left the Warner Robins Air Logistics Center on Feb. 23 -- two days ahead of schedule.

The aircraft, retrieved from Baghdad by a team from the 653rd Combat Logistics Support Squadron, returned here Jan. 21. Before its return, 653rd CLSS workers made temporary repairs to the plane so it could be flown. Once here, the C-5 production branch workers took over and made permanent repairs to return the aircraft to Air Mobility Command and get it back into the airlift rotation.

The work on the battle-damaged aircraft did not interrupt normally scheduled work, said Al Hainse, C-5 production manager. "Some of the guys from the 653rd CLSS who went over there and actually got the plane helped work the damage,” he said. “It was civil-service and active-duty [people] working side by side not only to get this aircraft back to AMC on time, but two days early. "The workers were enthusiastic about the aircraft, said David Johnson, a C-5 planner. "Working on something that was actually in battle brought out their pride," he said. "They were interested in getting it back to the warfighter as soon as possible.”

With the large troop rotation planned in the near future, it was important to have the plane completed and back to AMC as soon as possible, Mr. Johnson said.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC