AD: Honeywell | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Oct 30, 2006

AD: Honeywell

AD NUMBER: 2006-22-05
MANUFACTURER: Integrated Navigation Unit
SUBJECT: Airworthiness Directive 2006-22-05
SUMMARY:
The FAA is superseding an existing airworthiness directive (AD), which applies to various aircraft equipped with certain Honeywell Primus II RNZ-850( )/-851( ) integrated navigation units (INUs). That AD, as one alternative for compliance, provides for a one-time inspection to determine whether a certain modification has been installed on the Honeywell Primus II NV-850 navigation receiver module (NRM), which is part of the INU. In lieu of accomplishing this inspection, and for aircraft found to have an affected NRM, the existing AD provides for revising the aircraft flight manual to include new limitations for instrument landing system approaches. This new AD requires inspecting to determine whether certain modifications have been done on the NRM; and doing related investigative, corrective, and other specified actions, as applicable; as well as further modifications to address additional anomalies. This AD results from reports indicating that erroneous glideslope indications have occurred on certain aircraft equipped with the subject INUs. We are issuing this AD to ensure that the flightcrew has an accurate glideslope deviation indication. An erroneous glideslope deviation indication could lead to the aircraft making an approach off the glideslope, which could result in impact with an obstacle or terrain.

FMI: www.faa.gov/regulations_policies/airworthiness_directives/

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC