Viking Phase II Avionics Upgrade For Series 400 Twin Otter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Nov 17, 2015

Viking Phase II Avionics Upgrade For Series 400 Twin Otter

Upgrade Package Will Provide Significantly Increased Functionality

Since the Series 400 Twin Otter’s first introduction in 2010, Viking has been working with supply chain partners to continuously improve the quality and conformity of components and systems throughout the aircraft. The most notable example of this product development initiative is the Phase II Avionics upgrade to the Series 400 Twin Otter’s Honeywell Primus Apex fully integrated digital avionics suite.

The Phase II avionics upgrade package will provide significantly increased functionality of the Honeywell Primus Apex system on the Series 400 Twin Otter, including: 3-Axis Autopilot, Terrain Collision Avoidance System (TCAS) II, FAA-compatible engine instrument display, Wide Area Augmentation System (WAAS), Coupled Vertical Navigation (VNAV), Localizer Performance with Vertical (LPV) guidance, Automatic Dependent Surveillance – Broadcast Out (ADS-B Out), SmartView Synthetic Vision System, and 512-word Flight Data Recorder (FDR).

Final design and testing work on the Phase II package was completed in July, with the FAA granting Honeywell a Technical Standard Order (TSO) in mid-September. Viking has submitted the upgrade package to Transport Canada for regulatory approval and expects certification to be received before the end of 2015.

Once Canadian regulatory approval has been received, Viking will apply to international regulators for validation in each country where the Series 400 Twin Otter is currently in operation. While approval time for each country will vary, Viking expects to receive full international validation of the Phase II upgrade package by mid-2016.

Phase II Avionics upgrades will be made available for existing Series 400 Twin Otter operators through Viking’s Global Customer Support group, with in-service retrofits and training scheduled upon receipt of approval from the operator’s local regulator.

(Image provided by Viking)

FMI: www.vikingair.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC