Falcon 9 Stands Tall At SLC-40 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Jan 13, 2009

Falcon 9 Stands Tall At SLC-40

Rocket Raised Two Days Ahead Of Schedule

Space Exploration Technologies (SpaceX) announced this week its Falcon 9 launch vehicle was successfully raised to vertical on Saturday, January 10 at Space Launch Complex 40 (SLC-40) in Cape Canaveral, FL -- two days ahead of schedule. This operation was a critical step in validating a variety of system interfaces and launch processes in preparation for the maiden flight of Falcon 9 later this year.

"Any engineered system has requirements that can only be recognized through actual assembly of real hardware," stated Brian Mosdell, Director of Florida Launch Operations for SpaceX. "This rapid integration and stand-up provided our engineers and technicians with invaluable insights that will greatly streamline our effort towards the first Falcon 9 launch in 2009."

SpaceX completed the Falcon 9 vehicle integration in a horizontal position on December 30, 2008. After integration, Falcon 9 was lifted and mated to a transporter erector system, designed and built by SpaceX, which carried the 17 foot diameter, 180 foot long rocket to the launch pad.

On January 10 at 12:45 PM EST, SpaceX began the process of raising Falcon 9 and approximately 30 minutes later, Falcon 9 stood vertical at the Cape.

"This entire process has helped us validate key interfaces and operations prior to executing our launch campaign with the vehicle in its final flight configuration," said Elon Musk, CEO and CTO of SpaceX. "We encountered no show-stoppers or significant delays. I am highly confident that we will achieve our goal of being able to go from hangar to liftoff in under 60 minutes, which would be a big leap forward in capability compared with the days to weeks required of other launch vehicles."

This latest accomplishment follows closely on a series of recent successes for SpaceX. In November 2008, SpaceX successfully conducted a full mission duration firing of Falcon 9, validating SpaceX's use of nine engines on the first stage, as well as the ability to shut down engines without affecting the remaining engines.

In December 2008, NASA selected the Falcon 9 launch vehicle and Dragon spacecraft as the primary means of transporting cargo to and from the International Space Station after the Space Shuttle retires in 2010.

FMI: www.spacex.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC