AD: International Aero Engines LLC Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Mar 23, 2020

AD: International Aero Engines LLC Turbofan Engines

AD NUMBER: 2020-05-28

PRODUCT: All International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2019-11-08 for all International Aero Engines, LLC (IAE) PW1133G-JM, PW1133GA-JM, PW1130G-JM, PW1129GJM, PW1127G-JM, PW1127GA-JM, PW1127G1-JM, PW1124G-JM, PW1124G1-JM, and PW1122G-JM model turbofan engines.

AD 2019-11-08 required the removal of the main gearbox (MGB) assembly and electronic engine control (EEC) software and the installation of a part and software version eligible for installation for engines that operate on extended operations (ETOPS) flights.

This AD retains the requirements of AD 2019-11-08 and requires replacement of the MGB assembly and EEC software on engines that do not operate on ETOPS flights.

This AD was prompted by multiple reports of in-flight engine shutdowns as the result of high-cycle fatigue causing fracture of certain parts of the MGB assembly.

DATES: This AD is effective April 21, 2020.

COST: The FAA estimates that this AD affects 72 engines installed on airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Replace the MGB assembly

  • Labor: 13 work-hours × $85 per hour = $1,105.
  • Parts: $75,000.
  • Cost per Engine: $76,105.

Replace the EEC software

  • 3 work-hours × $85 per hour = $255 per engine.
FMI: AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC