Wed, Feb 19, 2014
Payload Will Be A Satellite For The Republic Of Kazakhstan
The launcher for Arianespace’s initial Vega flight of 2014 began its build-up this week at the Spaceport in French Guiana, marking the first step in a mission campaign that will lead to its orbiting of the DZZ-HR high-resolution observation satellite. To initiate the activity, Vega’s P80 first stage was transferred yesterday from the Spaceport’s Booster Integration Building to the SLV launch zone. It was then positioned on the launch pad and protected by the mobile gantry.
The P80 is an advanced solid propellant motor that features a novel filament-wound casing structure. Using one of the largest, most powerful single-block solid propellant motors ever built, the 33-foot tall stage burns for approximately 100 seconds during Vega’s first phase of flight.
This third Vega mission’s DZZ-HR payload is a satellite produced by Airbus Defense and Space for the Republic of Kazakhstan’s government. Once in Sun-synchronous orbit, DZZ-HR will provide very-high-quality panchromatic and multispectral products for a wide range of applications, including cadastral surveys, management of natural resources, environmental monitoring and homeland surveillance.
Vega is the light-lift member of Arianespace’s launcher family, joining the medium-weight Soyuz and heavy-lift Ariane 5 in operations at the Spaceport. Developed in a European Space Agency program led by Italy’s ASI space agency and industrial prime contractor ELV SpA., Vega was conceived for the orbiting of small- to medium-sized satellites, including institutional and scientific spacecraft.
The first Vega launch (designated Flight VV01 in Arianespace’s numbering system) was a qualification mission performed in February 2012, carrying the LARES laser relativity satellite, a small ALMASat-1 technology microsatellite demonstrator, and seven CubeSats. It was followed by Flight VV02 in May 2013, which orbited the Proba-V, VNREDSat-1 and ESTCube-1 satellites.
(Image provided by Arianspace)
More News
Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]
Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]
Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]
From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]
Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]