Atlantis Nearly Ready For The Pasture | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, May 26, 2010

Atlantis Nearly Ready For The Pasture

Set To Return From Her Final Mission Wednesday

Atlantis astronauts stowed spacesuits, wrapped up the standard late inspection of the shuttle's thermal protection system ahead of schedule and enjoyed some time off Monday.


Atlantis Docked At ISS

Commander Ken Ham, Pilot Tony Antonelli and Mission Specialists Garrett Reisman and Piers Sellers began the inspection well ahead of scheduled start. By 4:50 a.m. they had finished their look at the right wing, by 5:52 a.m. the nose cap survey was complete and the left wing survey was finished at 7:17:a.m., about 2.5 hours ahead of the timeline.

The survey was done using the shuttle arm and its 50-foot extension, the orbiter boom sensor system. Early in the mission, a pan-tilt assembly at the boom's end supporting a laser dynamic range imager and an intensified video camera had been partly disabled by a snagged cable.

A secondary system on the boom was used for the day-after-launch survey, and spacewalkers cleared the cable snag on Wednesday. The pan-tilt assembly and its instruments functioned flawlessly today. The results will be analyzed on the ground before Atlantis is formally cleared to land.


Atlantis Landing STS129

Spacewalkers Mike Good and Steve Bowen finished working with the spacesuits and put them away while the survey was being done. After the survey the boom and the arm were stowed on opposite sides of the cargo bay sill, their work done for the mission.

Tuesday crew members stowed items in the cabin and checked out Atlantis' reaction control system and its flight control surfaces. Landing at Kennedy Space Center is scheduled for 0748 Wednesday. 

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC