Boeing Makes A Change At The Top Of The 747-8 Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Mon, Aug 30, 2010

Boeing Makes A Change At The Top Of The 747-8 Program

Mohammad Yahyavi Removed As Program Leader

Boeing said late last week that it has removed Mohammad "Mo" Yahyavi as the top executive of its delayed 747-8 program. The announcement came just one day following Boeing's announcement that the first delivery of the 787 would be pushed into at least February of 2011.

Management has taken much of the blame for the delays in both programs.

The Seattle Times reports that Boeing shifte Yahyavi to a 'special assignment', with no indication what his new duties would be. Program vice president Pat Shanahan announced the move to those in the program in an e-mail Friday afternoon. Shanahan will assume greater control over the overall program, the e-mail said.


747-8 Freighter

The 747-8 program delays may cause delivery of the first of the new freighters to slip into next year, much like the Dreamliner. Shanahan said last July that there had been come design issues that required "enhancement to the flight controls," which led to additional testing. No specific problem was ever identified to the media.

Flight testing on the stretch 747, which as a passenger aircraft will carry 476 people, did not start until February of 2010, though Yahyavi had told Boeing's board there would be three test aircraft flying by the end of 2009.

The 747-8 frieghter recently successfully completed a flight that tipped the scales at more than a million pounds at takeoff.

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC