New Launch Date For Endeavour Set | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jun 15, 2009

New Launch Date For Endeavour Set

Go For Wednesday At 0540

NASA managers have scheduled the next launch attempt of space shuttle Endeavour's STS-127 mission for 5:40 a.m. EDT on Wednesday, June 17.

Endeavour's planned June 13 liftoff was postponed because of a leak associated with the gaseous hydrogen venting system outside the shuttle's external fuel tank. The system is used to carry excess hydrogen safely away from the launch pad. That repair has been completed 

As a result, the Lunar Reconnaissance Orbiter, or LRO, and Lunar Crater Observation and Sensing Satellite, or LCROSS, are set to lift off together aboard an Atlas V rocket on Thursday, June 18. That launch pushed back a day to accommodate Endeavour's June 17 liftoff.

The leak postponed Endeavour's Saturday morning scheduled launch to the International Space Station. Teams on Kennedy's Launch Pad 39A have changed out internal seals in the Ground Umbilical Carrier Plate, or GUCP, which is attached to the external tank. The vent line runs from the GUCP, away from the launch pad to a "flare stack" where excess hydrogen is safely burned off.

Endeavour's leak was similar to what happened during the first launch attempt of space shuttle Discovery's STS-119 mission in March. Technicians are using the same repair method, which led to Discovery's successful launch on its next attempt

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC