Boeing Says Half Of Its Dreamliner Testing Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Apr 06, 2013

Boeing Says Half Of Its Dreamliner Testing Completed

Resolving The Battery Issue Taking Longer Than Originally Anticipated

Boeing says that it is half way through the testing process that it hopes will return the world's 787 fleet to service, with the rest of the ground and flight tests coming in the next week or so.

Boeing presented a potential fix to the lithium-ion battery problem to the FAA March 15th, and the agency gave its go-ahead for a flight test program. The batteries aboard a JAL Dreamliner caught fire while the airplane was sitting at a gate at Boston Logan International Airport in January. That and other issues with the batteries eventually led aviation safety agencies worldwide to ground the fleet of 49 delivered airplanes.

Reuters reports that ground testing is continuing at Boeing's labs in Seattle, and while the testing of the new battery configuration is going more slowly than the company had hoped, it is moving forward. "We are all working toward returning the 787 fleet to service in the most expeditious manner possible, but we are being thorough and won't shortcut the test and certification process," Boeing spokesman Marc Birtel said on Wednesday in a written statement.

The FAA will have to certify the new battery installation, which includes better insulation between battery cells, and a better-vented, more-robust enclosure. Additional flight tests are expected "in the coming days," Birtel said.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC