MQ-1C Gray Eagle Extended Range Flies 41.9 Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Sep 05, 2017

MQ-1C Gray Eagle Extended Range Flies 41.9 Hours

Endurance Flight Marks Completion Of Phase 2 Flight Test

An MQ-1C Gray Eagle Extended Range (MQ-1C ER) aircraft recently completed a 41.9-hour endurance flight, exceeding the 40 hour flight test goal. The Unmanned Aircraft System (UAS), designed and developed by General Atomics Aeronautical Systems, Inc. (GA-ASI), flew out of El Mirage, Calif. in a representative U.S. Army mission configuration. Since the first flight of MQ-1C ER on October 29, 2016, the aircraft has flown 43 test flights and accumulated over 260 hours in the air.

"This is an important milestone for the MQ-1C ER program," said David R. Alexander, president, Aircraft Systems, GA-ASI. "The MQ-1C ER represents a significant enhancement in capability over the currently fielded MQ-1C and will be a game changer on the battlefield in support of our Army customer."

Starting in late August, the MQ-1C ER production aircraft will begin flight test in Dugway, Utah for evaluation of the Army's First Article Test (FAT). FAT will demonstrate MQ-1C ER's mission capabilities, which include increased range, endurance, and payload capacity.

In January 2018, MQ-1C ER will go through Logistics Demonstration (Log Demo) where aircraft maintainability will be validated. Then in March 2018, Follow-on Operational Test and Evaluation2 (FOTE2) will demonstrate the aircraft's ability to meet all Army operational requirements in preparation for fielding, which is planned for August 2018.

(Source: General Atomics news release. Image from file)

FMI: www.ga.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC