Final Gulfstream G250 Joins Flight-Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jul 06, 2010

Final Gulfstream G250 Joins Flight-Test Program

Third Aircraft First Flew June 28

The third and final Gulfstream G250 test aircraft has joined the flight-test program, Gulfstream announced last week. The aircraft completed its first flight on June 28, taking off from Ben Gurion airport at 1030 local time. During the 2 hour, 56 minute flight, the aircraft reached a maximum speed of 250 knots and a top altitude of 20,000 feet.

All three aircraft that are part of the 1,300-hour flight-test campaign have now entered the flight-test program, beginning with the first, S/N 2001, on Dec. 11, 2009. Each aircraft has been assigned a specific series of tests to perform, with S/N 2001 focused on in-flight performance and handling, S/N 2002 on avionics and S/N 2003 on systems functionality and reliability.

"It's exciting to have all three test aircraft in the air," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "What's even more exciting is the response we're getting from the pilots. They've told us that the aircraft's handling qualities are excellent, rivaling those of our large-cabin aircraft. That's something we like to hear, because it means we hit the mark with our design. And we have our operators to thank for that, because they played a major role in creating this jet. This aircraft represents what they told us they wanted."

David Dagan, corporate vice president and general manager, Commercial Aircraft Group, IAI, said, "What we're witnessing today in the G250 flight-test campaign is the synergy of advanced engineering with skilled manufacturing and assembly. The hours of flight testing we are able to produce are exactly as we planned. The tests are executed exactly as we planned with the full completion of each test card, a true sign of the maturity of the design the teams brought forth."

The test aircraft have flown over 200 hours on more than 70 flights. S/N 2001 has reached its maximum speed of Mach 0.85 and altitude of 45,000 feet (13,500 m). The G250 made its longest test flight today with a duration of seven hours and one minute. Powered by twin Honeywell HTF7250G engines, the business jet is capable of traveling 3,400 nautical miles at Mach 0.80. Its initial cruise altitude is 41,000 feet.

The first G250 rolled out of the IAI manufacturing facility in Tel Aviv under its own power on Oct. 6, 2009. It is on schedule for type certification in 2011. The aircraft will be completed at the Gulfstream Mid-Cabin Center of Excellence in Dallas.

FMI: www.gulfstream.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC