Historic Cape Canaveral Tower Toppled | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Aug 11, 2005

Historic Cape Canaveral Tower Toppled

What took years to build required only seconds to knock down Aug. 6 when 171 pounds of strategically placed explosives toppled a historic 179-foot mobile service tower at the Cape Canaveral AFS.

The 1,300-ton structure was used to launch 51 Atlas/Agena space vehicles in the 1960s and 1970s. The most famous of those launches were five Lunar Orbiter missions for NASA in 1966 and 1967. Those missions photographed about 99 percent of the moon’s surface and helped pave the way for men landing on the moon in 1969.

The last launch from the complex was in April 1978 and then the pad was abandoned. Mother Nature then whittled away at the complex and the old tower, leaving a badly corroded structure in its wake.

Pieces of the rusty tower, along with toxic paint chips, fell to the ground over the years -- creating safety and environmental hazards.

“The demolition of this tower demonstrates our commitment to safety and a healthy environment,” said Teresa Fiorillo, 45th Civil Engineer Squadron project officer. “Yet, it’s kind of sad to see this historic structure go.”

“This is where we developed the Atlas intercontinental ballistic missile,” said Col. Mark Owen, 45th Space Wing commander. “This is where we sent the launches that NASA used to help map the moon. It is key to our history. So it is kind of like seeing an old soldier go. It is sad.”

Dick Ruffe, a retired Atlas systems engineer who helped build the complex and was involved with many of the flights, was on hand to witness the demolition.

“We accomplished a lot at (the complex),” he said. “Hard to imagine it, but it’s all gone in a puff of smoke. It came down a lot faster than it went up.”

The fallen tower will be cut up and taken to a landfill where it will be buried in a special cell. It will take about six to eight months to finish cleaning up the site, officials said. Once cleaned, it will be available for industrial reuse.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC