200th Ariane Launcher Takes Shape At French Guiana Spaceport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, Dec 14, 2010

200th Ariane Launcher Takes Shape At French Guiana Spaceport

Preparations Underway For February 2011 Mission With Europe's 2nd ATV

Assembly of the milestone 200th Ariane is now underway at the Spaceport in French Guiana in preparation for its February 2011 mission with Europe's second Automated Transfer Vehicle (ATV), which will service the International Space Station.


Ariane 5 Booster Assembly

This Ariane 5 ES version of Arianespace's workhorse heavy-lift launcher is being assembled in the Spaceport's Launcher Integration Building, where activity began mid-week with the core cryogenic stage's positioning over the mobile launch table. It was followed by rollout of Ariane 5's two large solid rocket boosters for mating with the core stage.

Ariane 5 is the latest version of Europe's Ariane launcher family, which began operations in 1979 and has orbited a full range of payloads that include telecommunications satellites, Earth observation and meteorology platforms, space exploration probes, along with defense and security spacecraft. Arianespace operates two standardized versions of Ariane 5: the ES version for flights to low- and medium-Earth orbits; and the Ariane 5 ECA for GTO (geostationary transfer orbit) missions.


Ariane 5 Cryogenic Core Delivery

The ATV for next February's flight is named after German astronomer/mathematician Johannes Kepler, and will be the second such unmanned logistics spacecraft launched by Ariane 5. These ATVs are part of Europe's contribution to the International Space Station's operation and maintenance.

FMI: www.arianespace.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC