AD: Eurocopter Deutschland GMBH Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jun 06, 2012

AD: Eurocopter Deutschland GMBH Helicopters

AD NUMBER: 2012-09-11

PRODUCT: Eurocopter Deutschland GMBH (ECD) Model MBB-BK 117 C-1 and C-2 helicopters.
SUBJECT: Airworthiness Directive 2012-09-11
ACTION: Final Rule

SUMMARY: This AD requires installing a placard that corresponds to the maximum permissible flight altitude, amending the Rotorcraft Flight Manual (RFM) to revise the maximum permissible operating altitude, and inserting revised performance charts into the RFM. This AD also requires a repetitive maintenance 'MAX N1 CHECK' to determine the appropriate maximum altitudes. This AD also requires, if the engine or a Fuel Control Unit (FCU) or module 2 or 3 is replaced, repeating the maintenance "MAX N1 CHECK." Finally, this AD specifies that modifying both engines would provide terminating action for the AD requirements.

This AD was prompted by the failure of a "few" engines to reach the specified one-engine-inoperative (OEI) rating at altitudes above 10,000 feet. The actions of this AD are intended to prevent flights at altitudes where the full OEI engine power cannot be reached and subsequent loss of control of the helicopter if an OEI operation is required.

DATES: This AD is effective July 9, 2012.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC