SpaceX Completes First Commercial Crew Transportation Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 23, 2014

SpaceX Completes First Commercial Crew Transportation Milestone

Certification Baseline Review Outlines Manufacturing Plans For Crewed Dragon Spacecraft

NASA has approved the completion of SpaceX’s first milestone in the company’s path toward launching crews to the International Space Station (ISS) from U.S. soil under a Commercial Crew Transportation Capability (CCtCap) contract with the agency.

During the Certification Baseline Review, SpaceX described its current design baseline including how the company plans to manufacture its Crew Dragon spacecraft and Falcon 9 v.1.1 rocket, then launch, fly, land and recover the crew. The company also outlined how it will achieve NASA certification of its system to enable transport of crews to and from the space station.

“This milestone sets the pace for the rigorous work ahead as SpaceX meets the certification requirements outlined in our contract,” said Kathy Lueders, manager of NASA’s Commercial Crew Program. “It is very exciting to see SpaceX's proposed path to certification, including a flight test phase and completion of the system development.”

On Sept. 16, the agency unveiled its selection of SpaceX and Boeing to transport U.S. crews to and from the space station using their Crew Dragon and CST-100 spacecraft, respectively. These contracts will end the nation’s sole reliance on Russia and allow the station’s current crew of six to increase, enabling more research aboard the unique microgravity laboratory.

Under the CCtCap contracts, the companies will complete NASA certification of their human space transportation systems, including a crewed flight test with at least one NASA astronaut aboard, to verify the fully integrated rocket and spacecraft system can launch from the United States, maneuver in orbit, and dock to the space station, and validate its systems perform as expected.

Throughout the next few years, SpaceX will test its systems, materials and concept of operations to the limits to prove they are safe to transport astronauts to the station. Once certified, the Crew Dragon spacecraft and Falcon 9 v1.1 rocket will be processed and integrated inside a new hangar before being rolled out for launch. This will all take place at the historic Launch Complex 39A at NASA’s Kennedy Space Center in Florida.

The Crew Dragon is expected to be able to dock to the station for up to 210 days and serve as a 24-hour safe haven during an emergency in space.

“SpaceX designed the Dragon spacecraft with the ultimate goal of transporting people to space,” said Gwynne Shotwell, SpaceX President and Chief Operating Officer.  “Successful completion of the Certification Baseline Review represents a critical step in that effort—we applaud our team’s hard work to date and look forward to helping NASA return the transport of U.S. astronauts to American soil.”

By expanding the station crew size and enabling private companies to handle launches to low-Earth orbit -- a region NASA has been visiting since 1962 -- the nation's space agency can focus on getting the most research and experience out of America's investment in ISS. NASA also can expand its focus to develop the Space Launch System and Orion capsule for missions in the proving ground of deep space beyond the moon to advance the skills and techniques that will enable humans to explore Mars.

(Images from file. Top: Uncrewed Dragon spacecraft. Bottom: Artists' rendering of Dragon V2)

FMI: www.spacex.com, www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC