Air Force Satellite Contract Up For Grabs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Feb 27, 2007

Air Force Satellite Contract Up For Grabs

Lockheed Martin and Boeing Competing

The Air Force says it needs 32 new global positioning satellites, to replace 24 of its currently orbiting satellites. The Pentagon will seek bids for the first phase of the tri-phased multi-billion dollar project in March, according to Candrea Thomas, spokeswoman for the Air Force's Los Angeles-based Space and Missile Systems Center.

The new satellites are intended for implementation of a new system, Global Positioning III, which is intended to improve navigation by air, land and sea. GPS III will also be more difficult to disable.

The Associated Press reports Boeing and Lockheed Martin will hotly contend for the contract and attempt to ensure that whoever is chosen for phase one will also lead the second and third phases of the contract. Both companies currently supply the Air Force with satellites.

Lockheed and Boeing have already received roughly $85 million from the Air Force for initial planning and development for the first phase of the contract, according to Maj. Regina Winchester, a Pentagon-based spokeswoman for the Air Force.

The first phase of the three-phase contract will be for eight satellites to be delivered by 2013, the second phase, for eight satellites by 2016 and the third phase, an additional 16 satellites by 2019, according to the Air Force. The total cost for this project has yet to be determined.

According to the AP, roughly $4.26 billion has been designated to GPS III research and development funding, excluding procurement funding, based on the Bush administration's fiscal years 2008-2013 proposed budget.

FMI: www.boeing.com, www.lockheedmartin.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC