ANN's Daily Aero-Term (01.12.14): GDP -- Ground Delay Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Jan 12, 2014

ANN's Daily Aero-Term (01.12.14): GDP -- Ground Delay Program

Aero-Terms!

Aero-Terms are designed to be a daily reminder of the terms, names, acronyms and explanations of the unique language that populates the aviation world. Aerospace, sport aviation, fixed wing, helo, you name it... it's all fair game.

Aero-Terms should serve as a quick but intriguing reminder of the terms you may use every day, or an introduction to an aspects of the Aero-World you may not yet be familiar with. ANN also encourages readers to go beyond the FMI link, and further research any intriguing terms.

Suggestions for future Aero-Terms are ALWAYS welcome, as are additions or discussion of the explanations given for each Aero-Term.

GDP -- Ground Delay Program

Ground Delay Programs are implemented to control air traffic volume to airports where the projected traffic demand is expected to exceed the airport's acceptance rate for a lengthy period of time. Lengthy periods of demand exceeding acceptance rate are normally a result of the airport's acceptance rate being reduced for some reason. The most common reason for a reduction in acceptance rate is adverse weather such as low ceilings and visibility.
How it works: Flights that are destined to the affected airport are issued Expected Departure Clearance Times (EDCT) at their point of departure. Flights that have been issued EDCTs are not permitted to depart until their Expected Departure Clearance Time. These ECDTs are calculated in such a way as to meter the rate that traffic arrives at the affected airport; ensuring that demand is equal to acceptance rate. The length of delays that result from the implementation of a Ground Delay Program depends upon two factors: how much greater than the acceptance rate the original demand was, and for what length of time the original demand was expected to exceed the acceptance rate.

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC