NASA Awards Development Contract For Ares I Roll Control Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, May 17, 2007

NASA Awards Development Contract For Ares I Roll Control Engines

First Stage Motors Will Keep Rocket Stable After Launch

The pieces of the complex development puzzle for NASA's next-generation space travel system are coming together. This week, NASA selected Aerojet-General Corp. of Redmond, WA to provide developmental engines for the Ares I crew launch vehicle first stage roll control system.

These engines are the first in a series of steps to develop the roll control system to manage the amount of rotation by the first stage solid rocket from liftoff to its separation from the second stage, ensuring that Ares I stays on the designated trajectory for the first two minutes of flight. The engines being developed by Aerojet under this contract will be used to mature the roll control system that will be used on the Ares I tests program.

The Ares I crew launch vehicle will transport the Orion crew exploration vehicle, its crew or other small cargo payloads to low-Earth orbit. The first stage will consist of a single solid rocket booster similar to those used on the space shuttle, but with a fifth motor segment added.

An upper stage consisting of a J-2X liquid hydrogen, liquid oxygen engine and the associated propellant tanks and fuel distribution systems will complete the trip to orbit.

The cost-plus-fixed-fee competitively-awared contract has an 11-month period of performance with a potential total value of $8.1 million, if the additional 11- month contract option for engine fabrication and testing is exercised.

The Ares I project is managed by NASA's Marshall Space Flight Center in Huntsville, AL for NAA's Constellation Program.

FMI: www.nasa.gov/constellation, www.aerojet.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC