F-35 Backup Engine Program To Be Scrapped | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Dec 30, 2005

F-35 Backup Engine Program To Be Scrapped

Aims To Save Cash In Expensive Development Program

Department of Defense representatives told Bloomberg News Friday the Pentagon plans to end a development program for a backup powerplant for the F-35 Joint Strike Fighter (JSF.)

The move -- which would have to be approved by Congress -- aims to save approximately $1.7 billion through 2011, according to a DoD memo released last week. That's not a small amount of money by any means -- but it is a relative drop in the bucket compared to the $256 billion total cost of the fighter jet development program.

The backup program was initiated by Congress in 1995, according to Bloomberg, with the intent of maintaining competition and, thus, lowering costs of the Pratt & Whitney-designed powerplant intended to be the primary engines for the JSF. In a $2.2 billion deal, GE and Rolls-Royce teamed up to develop a backup powerplant -- which also would have been utilized had technical problems cropped up with the P&W F135 units (below).

Both powerplants had been praised by the F-35 program manager, Admiral Steven Enewold, according to Bloomberg. In the end, the decision simply came down to money -- ending the program now saves $408 million in FY2007, and $438 million the following year.

Every little bit helps... and in consideration of budget constraints, as well as redirection of available funds towards meeting the needs of troops on the ground, the savings should make the hugely-expensive JSF a little more palatable to congressional leaders.

Lockheed-Martin is the primary contractor on the F-35 program, and as was reported in Aero-News is nearing completion of the first prototype F-35 in Fort Worth, TX.

FMI: www.lockheedmartin.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC