Japanese Investigators Find ANA Dreamliner Battery Miswired | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Feb 21, 2013

Japanese Investigators Find ANA Dreamliner Battery Miswired

Transport Ministry Says More Analysis Is Still Needed To Determine Cause Of Battery Fire

The Japanese Transport Ministry said Wednesday that a battery in the auxiliary power unit (APU) aboard an ANA Dreamliner which was forced to make an emergency landing January 16 was incorrectly connected to the main battery that overheated. But they have not said definitely that the miswiring was the cause of the failure.

Investigators said that the plane's flickering wing and tail lights after landing, coupled with the fact that the battery was switched off, led them to conclude that miswiring was allowing current to travel from the APU to the battery in an irregular way. The Associated Press reports that the JTSB said that it still needs to conduct further tests before it is ready to say why the main battery overheated and start smoldering, prompting the emergency landing.

The Board said that a protective valve could have prevented the irregular current flow. They indicated that they have made Boeing aware of their findings.

Meanwhile, Boeing is starting to feel the pinch of the worldwide grounding of its newest airliners, with airplanes starting to stack up on the ramps in both Everett, WA, and North Charleston, SC, waiting for delivery, and more coming off the assembly lines.

Reuters reports that Wall Street is casting an ever-more-wary eye at the company as the grounding drags on. The inability to deliver the airplanes that are coming off the line is costing the company some $200 million per month in final cash payments from customers, and keeping the production lines open is a $1 billion monthly expense to the planemaker. It will also incur extra costs as it works on a permanent fix to the battery problem that caused the grounding.

The company reportedly has a reserve of some $13.5 billion in cash and short-term investments, but analysts say that will be quickly eroded away as the planes continue to sit on the ramps. Boeing holds that it is still too early to determine what effect the 787 grounding will have on its 2013 bottom line.

(ANA Dreamliner pictured in file photo)

FMI: www.boeing.com

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC