Gates Explains Opposition To Alternate F-35 Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Sep 03, 2009

Gates Explains Opposition To Alternate F-35 Engine

Believes F136 Engine Would Face Same Development Problems As Primary Engine

A proposed alternative engine for the F-35 Lightning II joint strike fighter would cost far more than the existing engine and push back the production timetable, Defense Secretary Robert M. Gates said this week. Gates visited the Lockheed Martin F-35 factory in Fort Worth, Texas, Aug. 31 to see firsthand progress on what he called "the heart of the future of our tactical combat aviation."

Talking with reporters after his tour, Gates reiterated his longstanding opposition to an alternative F136 engine for the fifth-generation fighter jet's F135 engine. The companies that would build the F136 engine have been promoting it heavily and reportedly pitched a plan for a fixed-price contract at the Pentagon Tuesday.

"We feel strongly there is not a need for the second engine," Gates told reporters in Fort Worth. He noted that President Barack Obama agrees, and has threatened to veto any legislation that funds one.

Obama mentioned the F-35 engine program specifically during an Aug. 21 address to the Veterans of Foreign Wars Convention in Phoenix, as he vowed to reform the acquisition process and cut waste.

"Think about it: hundreds of millions of dollars for an alternate second engine for the joint strike fighter when one reliable engine will do just fine," Obama told the veterans.

Defense Department officials have looked at the business case for an alternative engine several times and have come to the same basic conclusion, Gates said. Not only would it add several billion dollars to the F-35 program, it also would push it back three, four or even more years, he said.

Meanwhile, "there's no reason to believe that it would not encounter the same kinds of development challenges that other new engines have encountered along the way," he said.

At a time when the department is "trying to count every dollar," Gates said, it simply can't afford to increase the F-35's bottom line.

FMI: www.dod.gov

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC