AD: Sikorsky Aircraft Corporation Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Sep 27, 2018

AD: Sikorsky Aircraft Corporation Helicopters

AD NUMBER: 2018-19-09

PRODUCT: Sikorsky Aircraft Corporation (Sikorsky) Model S-92A helicopters.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2017-14-03 for the aircraft listed above.

AD 2017-14-03 required an inspection and reduced the retirement lives of certain landing gear components.

This new AD retains the requirements of AD 2017-14-03, reduces the retirement lives of additional landing gear components, and requires repeating the inspection.

This AD was prompted by a revised analysis of the fatigue life of the landing gear.

COST: The FAA estimates that this AD affects 80 helicopters of U.S. Registry. The cost of compliance is estimated as follows:
At an average labor rate of $85 per work-hour:

  • Replacing a wheel axle P/N 2392-2334-001 requires 2 work-hours and required parts cost $22,000, for a cost per helicopter of $22,170.
  • Replacing a main landing gear (MLG) or NLG threaded hinge pin P/N 2392-2311-003 requires 1 work-hour and required parts cost $3,800, for a cost per helicopter of $3,885.
  • Replacing a NLG cylinder P/N 2392-4006-005 requires 1 work-hour and required parts cost $27,200, for a cost per helicopter of $27,285.
  • Replacing a NLG hinge pin P/N 2392-4312-003 requires 1 work-hour and required parts cost $4,400, for a cost per helicopter of $4,485.
  • Replacing a landing gear actuator rod end P/N 2392-0876-901 requires 1 work-hour and required parts cost $900, for a cost per helicopter of $985.
  • Replacing a MLG cylinder P/N 2392-2006-005 requires 2 work-hours and required parts cost $33,100, for a cost per helicopter of $33,270.
  • Replacing a MLG pin outboard P/N 2392-2312-003 requires 1 work-hour and required parts cost $4,300, for a cost per helicopter of $4,385.
  • Replacing a MLG bulkhead left-hand side P/N 92201-08111-105, -107, and -109 requires 70 work-hours and required parts cost $12,550, for a cost per helicopter of $18,500.
  • Replacing a MLG bulkhead right-hand side P/N 92201-08111-106, -108, and -110 requires 70 work-hours and required parts cost $12,550, for a cost per helicopter of $18,500.
  • Inspecting the NLG airframe fitting assembly P/N 92209-01101-041 requires 8 work-hours, and required parts cost is minimal, for a cost of $680 per helicopter and $54,400 for the U.S. fleet, per inspection cycle.
  • If required, replacing a NLG actuator fitting P/N 92209-01101-101 requires 70 work-hours, and required parts cost $10,000, for a cost per helicopter of $15,950.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC