St. George, UT Receives BIG Check From FAA For New Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 27, 2006

St. George, UT Receives BIG Check From FAA For New Airport

$17.2 Million Grant Will Be Used To Buy Land For Site

A program aimed at replacing the current airport in St. George, UT with a new facility received a big infusion of cash Tuesday, as FAA Administrator Marion Blakey handed a $17.2 million grant to Mayor Dan McArthur. The money will be used to buy land for the new airport, to be located five miles southeast of the city.

The Deseret Morning News reports more than 100 people attended the ceremony, held outside a terminal at the current airport. Supporters of the project in attendance included Utah Senator Orrin Hatch, and Representative Jim Matheson.

"I am really excited. This is a momentous, historical occasion," said McArthur. "We've had a lot of history in this process, but that's all behind us. What's really important is the future and we're moving forward in a positive, enthusiastic way. This is what it's all about."

As Aero-News reported last month, the new airport will ultimately be able to handle as many as 120,000 passengers by 2020 -- more than twice as many as the current facility, which offers service through regional operator SkyWest.

In addition to allowing room for expansion, the new facility will also offer a 9,300-foot runway, able to handle slightly larger jets than the 50-seaters flying into the current airport. The old facility (above) had also drawn the FAA's ire, due to its runway not meeting agency safety standards.

A replacement airport has been in the works for almost 20 years... and Blakey commended McArthur for his patience and optimism.

"I think we've all got a song in our hearts today," said Blakey. "If there's one word that's on everybody's lips, I think it's fair to say it's the word 'finally.' St. George is getting the number one thing it needs and that's a brand, spanking new airport."

"I did a little research before coming out here and found that this is Utah's biggest grant from the FAA ever," Blakey continued. "Good things come to those who wait. You deserve the kind of air service other areas in the country have enjoyed for decades and you've waited long enough."

FMI: www.sgcity.org/airport

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC