Pentagon Wants New Long Range Bomber | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, Feb 06, 2006

Pentagon Wants New Long Range Bomber

But Can The Military Afford It?

While military strategists and BUFF pilots may passionately argue otherwise... the truth is that one day, the B-52 Stratofortress WILL stop flying. When that time comes (it's worth noting is hasn't yet in over 50 years) the Pentagon wants to be ready... so the military is making its plans now.

The new bomber would be on the flight line within the next dozen years, according to the latest Quadrennial Defense Review. The QDR states the US should develop a new, land-based, long-range bomber by 2018 -- while, at the same time, updating the current fleet of B-1, B-2 and, yes, B-52 aircraft.

"The new bomber is one of the biggest initiatives in the QDR report,” said Loren Thompson, a military analyst at the Virginia-based Lexington Institute, to the Fort Worth Star-Telegram.

If the Pentagon goes along with the proposal, it would mean substantially speeding up the development of a new bomber, which was supposed to be completed by 2037.

One of the questions faced by planners and designers alike is, will this new long-range bomber be manned or unmanned? The QDR says at least 45 percent of the country's future air fleet will be unmanned.

Don't count on a new bomber just yet, however. President Bush this week will present his budget proposal... and Treasury Secretary John Snow says it will be austere. The president has promised to cut the federal deficit in half by the time he leaves office -- which means reducing America's current deficit of $337 billion in the red to $189 billion.

Such a plan would likely leave very little room for the development of a new bomber.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC