So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 09, 2016

So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico

Claim: Tijuana Plant Expected To Be Operating Early Next Year

Icon Aircraft, after failing to produce a workable manufacturing operation here in the states, will be shifting its composites fabrication to a plant to be built in Tijuana, Mexico early next year, according to reports in the Mexican media.

ElTijuanense.com reports that the company plans to invest more than $150 million in the plant, which will fabricate the composite components for the fuselage of the aircraft and ship them back to California for final assembly and flight testing. It is expected that more than 1,000 people will be employed at the plant.

Icon claims to have more than 1,800 deposits for the A5 amphibian airplane, according to the company... a number questioned by a number of industry observers. Tijuana was selected for its 'established industrial infrastructure, skilled labor force, and location near the final assembly plant in California', the report said.

The company has faced several questionable self-imposed challenges in bringing the A5 into production. While they made a big splash with the "delivery" of the first airplane at AirVenture in 2015 ... an airplane that was put on a truck and shipped back to California... their presence at AirVenture 2016 was muted, without so much as a news release a full year later. Statements about the capabilitiues and performance of the company have often been proven to be false and many of the claims made by the company are now viewed with suspicion.

Icon was planning a news conference in Mexico late Thursday to officially announce the construction of the manufacturing plant.

(Image from file)

FMI: /index.cfm?do=main.textpost&id=b3e320db-813f-4832-a5f3-5ee158ea34b8

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC