So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Fri, Sep 09, 2016

So Much For All Those California Jobs... Icon To Shift Composites Mfg To Mexico

Claim: Tijuana Plant Expected To Be Operating Early Next Year

Icon Aircraft, after failing to produce a workable manufacturing operation here in the states, will be shifting its composites fabrication to a plant to be built in Tijuana, Mexico early next year, according to reports in the Mexican media.

ElTijuanense.com reports that the company plans to invest more than $150 million in the plant, which will fabricate the composite components for the fuselage of the aircraft and ship them back to California for final assembly and flight testing. It is expected that more than 1,000 people will be employed at the plant.

Icon claims to have more than 1,800 deposits for the A5 amphibian airplane, according to the company... a number questioned by a number of industry observers. Tijuana was selected for its 'established industrial infrastructure, skilled labor force, and location near the final assembly plant in California', the report said.

The company has faced several questionable self-imposed challenges in bringing the A5 into production. While they made a big splash with the "delivery" of the first airplane at AirVenture in 2015 ... an airplane that was put on a truck and shipped back to California... their presence at AirVenture 2016 was muted, without so much as a news release a full year later. Statements about the capabilitiues and performance of the company have often been proven to be false and many of the claims made by the company are now viewed with suspicion.

Icon was planning a news conference in Mexico late Thursday to officially announce the construction of the manufacturing plant.

(Image from file)

FMI: /index.cfm?do=main.textpost&id=b3e320db-813f-4832-a5f3-5ee158ea34b8

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC