Airbus Starts Joining The First A350 XWB Front Fuselage | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Mon, Dec 12, 2011

Airbus Starts Joining The First A350 XWB Front Fuselage

Static Airframe To Be Used For Ground Testing

Airbus has started joining the first 69-foot long front fuselage section for the A350 XWB in Saint-Nazaire, France. This phase will continue over the coming weeks, and once completed, the front fuselage will be transported by Beluga to the A350 XWB Final Assembly Line in Toulouse. It will be the first major section of the A350 XWB to enter the final assembly line.

The front fuselage is destined for the A350 XWB static test airframe – the first A350 XWB to be assembled. It will be followed closely by the first “flyable” airframe for MSN1, one of the five flight test aircraft Airbus will build.

The static airframe is used solely for ground tests that will demonstrate the aircraft’s ability to sustain certification loads and provide key data ahead of the first flight in 2013.

FMI: www.airbus.com

Advertisement

More News

Airborne 05.25.16: Canada SeaPlane Regs, Blimp Downed, Citation Longitude Mated

Also: USAF Hassled, Hummel UltraCruiser, Helo Limits, FAA Video, Greg Connell Accident, Medical Helo Suit, Bombardier's 100th VistaJet Canada is proposing changes to their seaplane>[...]

Icon Steps Back, Admits Curtailed Production Plan

Finally Talking (And Still Hyping), Icon Production Plans Take A Big Hit The following is the text of a release from Icon Aircraft (bluster and all)... ANN Analysis and industry re>[...]

Solar Impulse 2 Is En Route To Lehigh Valley, PA

Atlantic Crossing Next Major Hurdle Solar Impulse 2 (Si2) departed Dayton (OH) International Airport with Bertrand Piccard at the controls, this morning at 0402 local time (UTC-4).>[...]

Icon Controversy Continues, But Icon Has Yet To Speak Up

The Company That Won't Answer Questions, May Finally Have To Do So ANN has been bombarded with info and reports concerning the health and well-being of the Icon Aircraft program...>[...]

ANN's Daily Aero-Linx (05.26.16)

Safety Management System (SMS) This FAA website was created as a public resource for those seeking to learn more about SMS within the aviation industry and the FAA.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC