KC-135 Tankers Get A Boost From Innovative, Fuel-Saving Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Sun, Jan 27, 2013

KC-135 Tankers Get A Boost From Innovative, Fuel-Saving Engines

Replacement Of Some 1,440 Engines Planned In Upgrade Program

Some decades-old KC-135 Stratotankers are drinking from the fountain of youth -- or at least the engines are. Airmen installed the first of 1,440 upgraded Stratotanker engines at MacDill Air Force Base, Fl, Jan. 15. The 1970s engine parts will be replaced with modern engines that burn less fuel and run longer without repairs, officials said.

"We expect the engine to stay on wing for 20-plus years and take the KC-135 into retirement," said Senior Master Sgt. Dong Kim, Air Mobility Command's propulsion branch chief.
 
Mounting the CFM Propulsion Upgrade Program on KC-135 and Navy E-6B Mercury culminates almost three years of work between Air Mobility Command, Air Force Material Command, the Navy and the original equipment manufacturer, CFM International. The C-PUP engine delivered to MacDill AFB is the first of 15 that will be delivered by General Electric Aviation under an F108 engine augmentation contract.

The refurbished engines upgrade the high pressure compressor and turbine sections of the KC-135's F108 engine, a military variant of the CFM56-2 engine. More than half of the engines on the KC-135 have not seen depot rework since they were initially installed; some dating back to 1984.

The engine depot at Oklahoma City Air Logistics Complex expects to deliver the first organically produced C-PUP engine later this year and is planning to produce 120 annually. The upgrade effort is projected to take 12 years to complete and will affect 1,440 engines, according to officials.

ANN salutes Maj. Mark Blumke Air Mobility Command Directorate of Logistics.

(KC-135 pictured in USAF file photo)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC