First Flyable A350 XWB 'MSN-001' Structurally Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited-08.13.18

Airborne Unmanned-08.14.18

Airborne Unlimited-08.15.18

AMA Drone Report-08.16.18

Airborne Unlimited-08.17.18

Airborne-YouTube

Airborne Unlimited-08.13.18

Airborne Unmanned-08.14.18

Airborne Unlimited-08.15.18

AMA Drone Report-08.16.18

Airborne Unlimited-08.17.18

It's ALIVE!!! The 2018 AirVenture Innovation Preview is Viewable RIGHT NOW at www.oshcast.com or www.oshcast.net!

Wed, Dec 05, 2012

First Flyable A350 XWB 'MSN-001' Structurally Complete

Aircraft Makes Its 1st Journey 'On Wheels'

Airbus has successfully completed the main structural assembly and system connection of A350 XWB ‘MSN-001’ – the first flight-test aircraft. The aircraft is shown here on its wheels for the very first time moving out of the main assembly hall (Station 40) at the recently inaugurated “Roger Béteille” A350 XWB Final Assembly Line in Toulouse. It then entered the adjacent indoor ground test station (Station 30).

The assembly work performed in Station 40 included the successful electrical power-on of the aircraft's entire fuselage and wings. Soon work in Station 30 will start by testing the aircraft's hydraulic system, followed by the full electric and hydraulic power-on of the aircraft which will be completed by around the end of the year. This will mark the start of several weeks of comprehensive functional system testing.

After the A350 XWB MSN-001 exits station 30, the aircraft will go through a series of extensive production and certification / development tests, be painted and have its engines installed. It will then be delivered to the flight-line and be readied for its first flight in mid-2013.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

It's ALIVE! 2018 AirVenture Innovation Preview Program Now Available

Get The Inside Details On THE Most Exciting NEW Innovations And Product Announcements From OSHKOSH 2018... The staff of EAA and the Aero-News Network were pleased to release the la>[...]

Airborne 08.15.18: Bell 525 Milestone, Parker Solar Probe, NIMBY Nonsense

Also: Aerion Supersonic, Hartsfield-Jackson Airport, Australia GA Maintenance, Flight Training Legislation The Bell 525 Relentless program is closing in on an anticipated 2019 cert>[...]

Airborne-Unmanned 08.14.18: Wing Delivery, Pilot Unions, Drones Herd Birds

Also: Cyberhawk, Oceans Unmanned, VerdeGo Aero, Swift Engineering A pioneering commercial BVLOS delivery by drone brought ice cream to a two-year-old in a demonstration conducted i>[...]

AMA Drone Report 08.16.18: Model Av Politics, MultiGP Int'l, Drone Chute

Also: Illinois Drone Rules, San Diego FD, 2018 UAS Summit & Expo, Drone Ops over DOD Facilities The aero-political scene remains active and a bit frustrating but AMA remains an>[...]

AMA Drone Report 08.16.18: Model Av Politics, MultiGP Int'l, Drone Chute

Also: Illinois Drone Rules, San Diego FD, 2018 UAS Summit & Expo, Drone Ops over DOD Facilities The aero-political scene remains active and a bit frustrating but AMA remains an>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC