FAA Administrator Huerta Dedicates New Taos Runway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, Aug 29, 2017

FAA Administrator Huerta Dedicates New Taos Runway

Federal Grants Totaling About $25 Million Paid For Most Of The Project

Culminating a two-decade-long effort, FAA Administrator Michael P. Huerta on Friday joined local and state officials in dedicating the new, 8,600-foot runway at Taos Regional Airport.

The new runway is perpendicular to the original runway. It will enable pilots to operate more safely at times of year when wind directions make the airfield more challenging.

The project also comes with important provisions aimed at protecting the lands and lifestyle of the Taos Pueblo.

“An airport is a treasure. It is the lifeblood of a community, an asset that must be nurtured,” Huerta said. “The result of our collaborative efforts is a project that will improve both the safety and utility of this important regional transportation link, while respecting the traditional values and unique culture of the Taos Pueblo.”

Federal grants totaling about $25 million paid for most of the project cost.

The environmental review for the project included extensive government-to-government consultation with the Taos Pueblo, Town of Taos and numerous state and federal agencies.

This resulted in a number of mitigations, including the installation and operation of a passive noise monitoring system. The system, which began operating in 2014, will support a pre-project and post-project comparison of flights over the Taos World Heritage Site and adjacent lands.

Additionally, the FAA raised the voluntary minimum flight altitude above the World Heritage site from 2,000 feet to 5,000 feet.

“We got this project right because all of the stakeholders approached this in a spirit of collaborative partnership,” Huerta said. “Without tenacity, dedication and determination we would not be standing here today.”

(Image provided with FAA news release)

FMI: www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC