AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, May 25, 2018

AD: Airbus Helicopters

AD NUMBER: 2018-11-01

PRODUCT: Airbus Helicopters Model AS332L2 and EC225LP helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires installing a cut-out for the left-hand (LH) and right-hand (RH) rail support junction profiles and inspecting splices, frame 5295, and related equipment for a crack.

This AD was prompted by reports of cracks on frame 5295 and on splices installed to prevent those cracks.

DATES: This AD is effective June 27, 2018.

COST: The FAA estimates that this AD affects 4 helicopters of U.S. Registry. Operators may
incur the following costs in order to comply with this AD:

  • Installing the cut-outs on frame 5295 requires 40 work-hours for a labor cost of $3,400. Parts cost $5,000 for total cost per helicopter of $8,400 and $33,600 for the U.S. fleet.
  • Inspecting helicopter frame 5295 requires 2 work-hours for a labor cost of $170 per helicopter. No parts are needed for a total U.S. fleet cost of $680 per inspection cycle.
  • Repairing a splice requires 40 work-hours and a parts cost of $5,000 for a total cost of $8,400 per helicopter.

Labor costs average $85 a work-hour.

FMI: AD

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC