Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.10.24

Airborne-NextGen-06.11.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.07.24

Tue, Feb 16, 2010

Aero-TV: CJ4 Precision Assembly Pt. 1 – Cessna’s Fuselage Build Process

CJ4 Program Manager, Norm Baker, Provides an Exclusive Factory Tour

At Cessna Aircraft, “safety begins with a durable airframe.” Each airframe is stress-tested five times the aircraft’s standard lifetime; yet, Cessna’s renowned safety and reliability begins on the production line.

State-of-the-art technology allows employees to create replicable, seamless assembly for each new aircraft on the line. In the first of his four-part series, Baker describes the CJ4’s fuselage build process.

The Citation CJ4 will debut two new dual-channel, FADEC controlled Williams International FJ44-4A engines. The turbofan engines each produce 3,400 pounds of takeoff thrust, allowing the aircraft to takeoff at max weight with as little as 3,300 feet of runway.

After takeoff, the Citation CJ4 is capable of a direct climb to 45,000 feet in just 28 minutes. In addition, the CJ4 will offer increased performance over earlier projections with a maximum cruise speed of more than 450 knots and a maximum range of over 2,000 nautical miles.

On February 2nd, 2010, Cessna announced the completion of all certification testing. Three Citation CJ4 test aircraft completed over 1,100 flights with more than 2,000 flight hours accumulated. With the CJ4 in the final stages of F.A.A. type certification approvals, the company expects deliveries to begin in late 2010.

FMI: www.cessna.com/index.html, www.cessna.com/citation/citation-cj4.html, www.aero-tv.net, www.youtube.com/aerotvnetwork, http://twitter.com/AeroNews

Advertisement

More News

ANN's Daily Aero-Term (06.10.24): Known Traffic

Known Traffic With respect to ATC clearances, means aircraft whose altitude, position, and intentions are known to ATC.>[...]

ANN's Daily Aero-Linx (06.10.24)

Aero Linx: Aviation Suppliers Association (ASA) Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association,>[...]

ANN's Daily Aero-Term (06.11.24): Abeam

Abeam An aircraft is “abeam” a fix, point, or object when that fix, point, or object is approximately 90 degrees to the right or left of the aircraft track. Abeam indic>[...]

ANN's Daily Aero-Linx (06.11.24)

Aero Linx: The Air Charter Safety Alliance The group, called the Air Charter Safety Alliance, will raise awareness of illegal charter flights among potential customers, charter bro>[...]

Aero-News: Quote of the Day (06.11.24)

“For months, ALPA has been sounding the alarm on the ongoing efforts by some aircraft manufacturers to remove pilots from the flight deck and replace them with automation. To>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC