Australia Won't See Wedgetails Until Late 2009 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 26, 2008

Australia Won't See Wedgetails Until Late 2009

Modified 737s Over 28 Months Late

Boeing has suffered a series of embarrassing delays in developing some of its civilian aircraft. But Boeing Integrated Defense Systems is not immune from embarrassment, either.

In 1997, Australia made the commitment to Project Wedgetail, involving procurement of at least four of Boeing's 737-700 Airborne Early Warning & Control E-7A, Multi-role Electronically Scanned Array RADAR Antenna surveillance aircraft. Military officials down under had no idea their wait for the aircraft would end up being even longer than its name.

The plane's claim to fame is its extremely versatile, electronically-scanned radar antenna array. The system, built by Northrup Grumman, allows conducting several types of search and control functions simultaneously. The plane is a modified 737 capable of as many as 12 operating positions inside. Australia has ordered its planes equipped with ten operating positions.

If you'd expect that multitasking capability to be a systems-integration nightmare, you'd be right. Australia was to get its first plane in 2006, and Boeing insisted it was on schedule. But in June of that year, the Australian government announced that the company was admitting development had fallen behind by 18 months.

That estimate proved optimistic, and the company now projects delivering the first plane a year from now, and mission readiness sometime in 2010, more than 28 months late. So, is Boeing at risk of losing the order?

The Australian reports that throughout the ordeal, Australia has not only stuck with the Wedgetail, but taken advantage of options for two more, beyond the four originally ordered, for a total outlay of four-billion dollars. Defence Procurement Secretary Greg Combet told the Australian Command and Staff College that while the Wedgetail is on the government's "Projects of Concern" watchlist, there are no plans to cancel it.

"Just last week there was a summit held in Canberra where we discussed how we are going to move things forward," he said. "I am pleased to say progress was made in those discussions but there is much more work to be done yet."

Then he added, "This is probably the project that keeps me awake the most at night."

FMI: www.boeing.com/ids

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC