Discovery Tanking Test Pushed To Mid-December | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Dec 09, 2010

Discovery Tanking Test Pushed To Mid-December

Test Will Help Verify Repairs To External Fuel Tank Stringers

Space Shuttle Program managers reviewed plans Tuesday for conducting a test of shuttle Discovery's external fuel tank no earlier than Wednesday, Dec. 15 at NASA Kennedy Space Center's Launch Pad 39A in Florida. Details of the tanking test, which include placing instruments on several locations of the external tank, were briefed to NASA senior management Wednesday afternoon.

Engineers have been meeting this week to evaluate plans for the test. It will help verify repairs associated with cracks on the tops of two 21-foot-long, U-shaped aluminum brackets, called stringers, on the external tank and help engineers determine what caused the cracks in the first place. Technicians repaired the cracks and reapplied foam insulation on the stringers last month. Tanking test plans call for recording temperature and strain gauge measurements in the intertank region near the top of the external tank where the stringers are located.

Managers determined last week more tests and analysis were needed before proceeding with Discovery's STS-133 mission to the International Space Station. Discovery's next launch opportunity is no earlier than Feb. 3 at 0143 EST.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC